Representative scenario · Healthcare

Outpatient clinic: tunable white and nurse-station scenes on BACnet

How we'd bring tunable white into a busy outpatient clinic without disturbing clinical color judgment, and how exam-room occupancy would reach the BMS so empty rooms stop being conditioned like full ones.

Representative scenario. A composite of the buildings we see most often, not a client case study. Results are design-stage projections, not measured outcomes.

ProjectLytbit · Smart lighting & IoT
SheetD-03
Rev26.11
DisciplineTunable White
DrawnLytbit Engineering
Scale1 : 1
A row of glass teacups on a nurse-station counter, steeped from pale to dark, each beneath a ceiling light whose glow matches it, while a small nurse figure turns a dial.
Plate D-03One pot, one set of cups; the hour decides how strong it should be.

The building

Sector
Outpatient healthcare
Size
About 38,000 sq ft, single story, 30 exam rooms and 2 procedure rooms
Region
North Mississippi
Scope
Tunable-white LED troffers on DALI-2, scenes and after-hours modes, vacancy sensing in exam rooms, and BACnet/IP points to the existing BMS
Timeline
About 4 months, with ceiling work at night and on Sundays under infection control measures
Industry
Healthcare

What we'd expect

40–50%projected lighting energy reduction vs. current operation, after the tunable-white premium
58–72 MWhprojected annual lighting energy avoided
5–10%projected VAV energy reduction in exam-room zones from occupancy setback

Illustrative projections based on typical operating hours and published program averages. Every real building gets its own baseline measurement.

Scene and sequence schedule

The intent we'd write into the Sequence Book. Exam and procedure lighting never changes color temperature on its own.

SpaceDayEveningAfter hoursControls
Corridors and waitingTrimmed maximum, neutral to cool by mid-morningWarmer, 70%30% path level, full on occupancySchedule plus occupancy
Nurse stationsDay sceneEvening sceneNight scene: low and warm, task lights onKeypad scenes; return to schedule at the next scheduled change
Exam roomsExam or Consult scene, manual onSameOffVacancy, 20 min; occupancy point to the BMS
Procedure roomsFixed color temperature, high color rendering, manual onSameOffVacancy with a long hold time; no tuning
Staff work and break roomsBrighter, cooler morning settingNeutralOffVacancy, 15 min
Saturday walk-in wingDaytime curveClosedOffWing mode at a keypad; other wings stay in after-hours mode

The building

This is a representative scenario built from a common North Mississippi building: a single-story outpatient clinic. The numbers are design-stage projections, not measured results.

The clinic is about 38,000 sq ft, with thirty exam rooms, two minor-procedure rooms, a lab draw area, two nurse stations, waiting areas and staff offices. It opens at 7:00 a.m. and closes at 7:00 p.m. on weekdays, and one wing runs a Saturday-morning walk-in clinic. Cleaning crews work evenings.

Lighting is fluorescent troffers from a 2010 build-out, on a relay panel with a time clock and wall switches. Connected lighting load is about 42 kW, and the lighting uses roughly 145 MWh a year, because corridors and waiting areas stay lit from early morning until the cleaning crew leaves. A BACnet building management system runs the rooftop units and VAV boxes.

Constraints

  • The clinic is open six days a week, so ceiling work happens at night and on Sundays.
  • Ceiling work in a healthcare space needs an infection control risk assessment, dust containment and the facility’s permission to open each area of ceiling.
  • Clinical color judgment. Clinicians assess skin tone, wounds and bruising, so exam and procedure lighting needs high color rendering and a color temperature that stays put during an exam.
  • Ventilation rules. Some rooms can reduce airflow when empty and some cannot. The mechanical engineer decides; the lighting provides the occupancy signal.
  • IT review. The lighting system stores no patient information, but it sits near systems that do, so IT will review it like any other network device.

What we’d do, by phase

Survey. Walk the clinic with the nurse manager during a day shift and with the evening cleaning crew. Measure existing light levels and color temperature, and map which rooms the BMS already controls separately.

Bench. Put tunable-white troffers from two manufacturers on the bench in the Lytbit Lab, controlled over DALI-2 device type 8. We’d measure color temperature and color rendering across the tuning range, check that the two brands match side by side at the same setting, and test for flicker at low dim levels. If they don’t match, one brand goes.

Design. Write scenes and sequences by space, as in the schedule above. Exam rooms get vacancy sensing and two scenes: Exam, bright and neutral, and Consult, lower and warmer. Procedure rooms get fixed, high-CRI light with no tuning. Corridors and waiting areas follow a daily curve, cooler mid-morning and warmer in the evening, designed with ANSI/IES RP-46-25 as a reference and without promising health outcomes. Nurse stations get Day, Evening and Night scenes. For the BMS, we’d agree a points list: an occupancy value per exam room and a mode value per wing, over BACnet/IP on a segmented network, since the existing BMS doesn’t support BACnet/SC.

Oversee. Review submittals for exact driver types, because DT8 tunable white and dual-channel 0-10V aren’t interchangeable, and check infection control measures on each night’s work area.

Commission. Measure color temperature and illuminance for every scene with a spectrometer, test vacancy timeouts, and verify that each exam room’s occupancy point reaches the BMS and drives only the setback the mechanical engineer approved.

Operate. A quarterly review with the nurse manager in Lytbit Ledger: which scenes get used, which overrides stick, and where staff are working against the schedule.

Projected outcome

Measure Current operation Projected
Annual lighting energy about 145 MWh 73–87 MWh
Corridor and waiting lighting after 8:00 p.m. full output until cleaning ends 30% path level, full on occupancy
Exam-room VAV energy fixed schedule 5–10% lower
Nurse-station lighting changes wall switches three scenes, one button each

The reduction is smaller than in our warehouse and plant scenarios, and that’s deliberate. Tunable-white fixtures and a daytime curve aimed at non-visual effects cost some energy, and a DOE study of circadian lighting in offices found that design strategy decides how much. We’d spend that energy in staff work areas in the morning and recover it in empty exam rooms and after hours.

What we’d watch out for

  • Clinician skepticism. One color shift during an exam in the first week, and the whole system gets locked to a single setting. That’s why exam scenes don’t tune.
  • Night scenes left on in the morning. Nurse-station scenes return to the schedule at the next scheduled change.
  • Mixed drivers creeping in through substitutions.
  • Setback applied to rooms that must hold airflow. The mechanical engineer’s list is the only list.

What we’d do differently next time

We’d build a one-room mockup in the Lab and invite the nurse manager and two clinicians before the design is final. Scenes described in a document get approved; scenes seen in person get corrected. We’d also fix a single tuning range for every fixture type at the start, so no corner of the clinic ends up warmer than the rest at the same setting.