Resources

Lighting controls resources

Tools and references for owners, facility managers, IT leads and finance teams who want to understand a controls decision before they pay anyone to make it.

ProjectLytbit · Smart lighting & IoT
SheetR-00
Rev26.11
DisciplineResources
DrawnLytbit Engineering
Scale1 : 1
A workshop pegboard with tools hung in front of painted outlines, one outline empty, while a small figure carries the missing tool toward a ceiling plan on a table.
Plate R-00The right instrument is easier to find when every one has a place.

Pick the resource that matches your question

Each resource answers one kind of question, and none of them asks for your email address.

  • What could controls save in my building? Use the Savings Estimator. It returns a range, shows every assumption, and keeps HVAC setback separate from lighting.
  • Which protocol should we use? The Protocol Explorer compares twelve protocols and data models by layer, with what each is good for and what tends to go wrong.
  • What does that acronym mean? The Glossary defines the terms that turn up in specifications, utility applications and IT reviews.
  • How do we buy this without regret? The Buyer’s & RFP Guide covers the decisions to make before bidding, the spec clauses to insist on, and the questions to put to every bidder.

Where people usually start

Owners and facility managers tend to start with the estimator and the buyer’s guide. IT leads and engineers start with the protocol explorer, then read our integrations and protocols page. Finance teams start with the estimator, then look at incentive management and lighting-as-a-service.

How we keep them honest

These pages are written by the same controls, network and data engineers who write our sequences and run the Lytbit Lab. Where we use a published figure, we name its source, such as DLC’s estimate of about 49% average savings for NLC and 63% for NLC with LLLC. Where no good figure exists, we give a range and label it illustrative. When standards move, as DLC NLC 5.2, BACnet/SC adoption and Matter’s commercial roadmap are moving now, we update the page.

For deeper reads on single topics, browse the blog. If a question isn’t answered anywhere here, send it to lab@lytbit.com.

Tell us about the building.

Floor plans, utility bills and a list of what bothers you are enough to start. We reply within one business day with what we would look at first.